Hands-free load guidance

RiggerSafe®
Southern Industry.

Refinery maintenance, steel and industrial fabrication

Chennai / Manali · Salem · Mangalore · Kochi

Find where the hand
enters the task.

The government refinery register includes Chennai Manali, Mangalore and Kochi; SAIL lists Salem Steel Plant. These are distinct operating settings requiring different contact and access reviews.

01 / TASK REVIEW

Review support and orientation before guiding a fabricated assembly into position.

02 / TASK REVIEW

Confirm whether the load surface permits a rubber, low-friction or aluminium insert.

03 / TASK REVIEW

Assess the full approach and release sequence rather than the final photograph alone.

Three colours / one guidance purpose

Match the interface.
Keep the load supported.

Choose the head insert and working length around the actual load surface, movement and available space. Review the complete approach, contact and release.

RiggerSafe is a guidance tool. It must not lift, suspend, support, pry, lever or arrest a load. Proof-test values are not a lifting capacity.

Selection guide ↓
Supply to Southern Industry

Make the enquiry
specific to your site.

State the site and intended task, required working reach, quantity and timing. PSC confirms the model and delivery arrangement rather than assuming availability by region.

Quote the colour, length, insert and quantity. Availability, packing, freight and delivery timing are confirmed by PSC with the quotation.

Prepare an enquiry ↗

Start with a representative trial.

Record the hand’s function, select suitable contact points and evaluate engagement, release, posture and communication within the approved lifting method. Use operator feedback before standardising.

Plan a site trial ↗

Location reference

PPAC — southern refinery locations ↗

Industry context does not imply product endorsement, installation or a PSC branch at the named location.

Explore India applications